Rosgal is currently undertaking ‘Cheadle Hulme Crossings Package, Bird Hall Road’ for Totally Local Company (TLC).
The works began on 21/6/2021 with an expected works duration of 8 weeks.
The scope of these works is to excavate within the carriageway to remove the existing traffic islands, excavate to remove the existing kerbs, and install a number of cycle lanes (as per specific drawings by TLC).
Our trained and competent operatives are conducting the works in line with the client’s requirements and specifications and the relevant legislation including ‘HSG 47, Avoiding Danger from Underground Services’.
———-
Week 2: The works are currently being undertaken safely, on time, and within budget.
Week 3: We have been able to maintain access to the adjacent properties and provide suitable footpaths for local residents to use.